Assembly and installation of tanks, reservoirs and metallic containers. Construction of industrial structures and buildings.

TECHCOMET - construction and installation of oil storage tanks

Year Name Tankage Customer Country
1998 Terminal of light mineral oil 10000 m3 Unicom Oil Terminal Romania
1999 Terminal of dark mineral oil 30000 m3 Unicom Oil Terminal Romania
2000 Terminal of chemical products 6000 m3 Unicom Oil Terminal Romania
2001 Terminal of reception and storage of cement 3000 m3 Unicom Oil Terminal Romania
2002 Terminal of light mineral oil 10000 m3 Unicom Transit Romania
2003 Terminal of dark mineral oil 10000 m3 Unicom Transit Romania
2004 Terminal of reception of oil 5000 m3 Unicom Holding Romania
2005 Terminal of reception of oil 9000 m3 Unicom Holding Romania
2006 Terminal of light mineral oil 24000 m3 Azizi Hotak Group Afghanistan
2007

Gas terminal "river – railway"

200 m3 BulRomGas Romania
2008 Reconstruction of manufacture «Synthesis of pitches and varnishes» and a warehouse «Combustible and easily inflammable liquids» “Moldavizolit” the Joint-Stock Company Moldova
2009 Terminal of light mineral oil 18000 m3 Ahmad Yar Group Ltd Afghanistan
2010 Terminal of light mineral oil 24000 m3 Inter Asia Trade Afghanistan
2011 Terminal of light mineral oil 28000 m3 Ahmad Yar Group Ltd Afghanistan

Romania | "Unicom Oil Terminal ", Galati, 10000 m3

  1. Refined Oil terminal consisting of two (2) vertical cylindrical above-ground steel tanks, each 3000m3, and four (4) vertical cylindrical above-ground steel tanks, each 1000m3.
  2. Fire extinguishing and water cooling systems.
  3. Aluminum floating covers made by Ultraflote, Inc.
  4. Pipelines and pumping station for 3 refined oil products (gasoline, gasoline & diesel) with displacement capacity of 250 m3/hour.
  5. Trestle with 28 posts for transshipment of fuel oil from broad gauge to narrow gauge railways; water-free heating facility, steam pipelines, satellites, and fuel oil pipelines.
  6. Fuel Oil Storage with 1000m3 and 300m3 tanks, pumping station & pipelines.
  7. Berth for river/sea navigation ships, trestle and pipelines to berth, Foam Fire Extinguishing System.
  8. Terminal for fuel oil with 3 steel vertical tanks each with 10000m3 capacity; fuel oil pipelines, steam pipelines, and trestle; Pumping station for fuel oil consisting of 3 pumps each with 200m3/hour displacement capacity.
  9. Crude Oil discharging station with 24 posts for discharging broad gauge cars, discharge pumping station with 2 pumps, each with 250m3/hour displacement capacity.
  10. Chemical products terminal consisting of 2 tanks, each 3000m3 capacity; railway ramp for transshipment from broad gauge to narrow-gage railway cars.
  11. Cement terminal with 12х250 tons silage. Discharge from broad gauge to narrow gauge railway cars, from narrow-gauge cars to silage; Transshipment from broad gauge to narrow gauge cars, then to silage and finally to river/sea navigation barge; Berth for river/sea navigation ships. Pneumatic transportation of cement; Compressor station; Cement pipelines.


Black oil storage; Black oil ramp; Chemical terminal; 2x3000

Deck refueling (bunkering) station for ships

Black oil ramp; Black oil storage 3x10000; Concrete terminal

Gaz terminal

Romania | "Unicom Transit", Halmeu, 10000 m3

  1. Terminal for refined oil products with three (3) tanks of 3000m3 capacity, and one tank of 1000m3 capacity. Aluminum floating covers made by Ultraflote, Inc.
  2. Terminal for dark oil products with one tank of 10000m3 capacity.
  3. Pumping station for (5) types of refined and dark oil products, displacement capacity designed for each product 250m3/hour; oil products pipelines and steam pipelines.
  4. Trestle with 14 posts for trans-shipment of refined oil products from broad gauge cars to narrow gauge cars.
  5. Trestle with 6 posts, transshipment of dark oils from broad gauge to narrow gauge, water-free heating system.
  6. Internal network of pipelines for fire-extinguishing and water-cooling systems, foam fire extinguishing system.
  7. Truck loading trestle with 3 posts.


Railway ramp; reservoir park; Autoloading ramp

Dark oil reservoirs

Petroleum storage tank with ponton

Romania | Unicom Transit", Dornesti, 5000 m3

  1. Internal network of pipelines for fire-extinguishing and water-cooling systems.
  2. Foam fire extinguishing system for oil products terminal.
  3. Ramp with 28 posts for transshipment of crude oil from broad gauge to narrow-gage railcars.
  4. Pumping station with two (2) pumps, 250m3\hour displacement capacity each.
  5. Tank-storage for crude oil 5000m3 capacity with fire-extinguishing system.
  6. Railway ramp with 14 posts for loading oil products to narrow gauge railcars.
  7. Pumping station with two (2) pumps, each 250m3\hour displacement capacity.
  8. Foam fire extinguishing system for oil products terminal.


Assembly of reservoir 10000 m3

Installation of foam station, foam preparation station

Oil terminal installation; Reservoir complex

Romania | "Unicom Holding", Drobeta-Turnu Severin, 9000 m3

  1. Trestle with 6 filling posts, two-way transshipment from broad gauge to narrow gauge railcars and vice versa.
  2. Tanks park with three (3) tanks, each 3000m3, water-cooling and fire-extinguishing systems. Internal floating roof made by Ultraflote, Inc.
  3. Pumping station for oil products with three (3) pumps, 120m3/hour displacement capacity each.
  4. Foam fire extinguishing system.
  5. Petroleum products pipelines.
  6. Truck loading trestle with two (2) posts.
  7. Internal network of pipelines for fire-extinguishing and water-cooling systems, chemical drainage system, waste-disposal facilities.
  8. Deck refueling (bunkering) station for ships (river/river navigation).
  9. Pumping station for water supply with two (2) pumps, 400m3/hour each.


Light oil terminal; Railway ramp

Light oil terminal; Railway ramp

Afghanistan | "Azizi Hotak Group", Hairatan, 24000 m3

  1. Reinforced concrete foundation works for railway trestle/ramp, railway manifold, metal and steel structures of railway trestle for 14 discharge posts, manifold pipelines.
  2. Foundations and supports for oil product vertical aboveground steel tanks.
  3. Metal structures of six (6) vertical steel tanks 3000m3 each, and six (6) vertical steel tanks 1000m3 each.
  4. Floating covers made by Ultraflote, Inc.
  5. Truck loading station with 12 posts, 100m3/hour each.
  6. Pumping station for truck loading station with 12 pumps, 100m3/hour each.
  7. Oil products pumping station with six (6) pumps, 275 m3/hour each, designed for five (5) types of refined oil products.
  8. Two (2) underground cylindrical reinforced concrete reservoirs for water, 1000m3 each.
  9. Oil products pipelines.
  10. Ultrasonic level monitoring, control & measuring systems of tank park, temperature monitoring system in reservoirs, Switches, connectivity and automation.
  11. Control room and switchboard for truck loading station. Electricity switches for pumping station;
  12. Power supply system, tank park lighting.
  13. Power transformer station.


Autoloading pumping station

Loading station; Reservoirs park

Autoloading ASN

Autoloading building place

Afghanistan | “Ahmad Yar Group Ltd”, Hairaton, 18000 m3

  1. The foundations of the railway trestles, railway manifold. Trestle metal construction, manifold piping.
  2. Tank farm foundations.
  3. Assembly of tank metal constructions: 9 steel vertical tanks 2000 m3 each, total tankage 18000 m3.
  4. Floating covers made by “KonTEK”.
  5. Trestle with 8 discharge posts, displacement capacity 90 m3/hour each.
  6. Pumping station - four pumps with displacement capacity of 150 m3/hour each, processes three different products simultaneously.
  7. Underground concrete tanks with water reserve for fire extinguishing - 2  tanks 1500 m3 each.
  8. Technological manifold.
  9. Road tanker loading gantry control building. Pump control panels.
  10. Electricity systems, lightning.
  11. Electric substation transformer.


Oil terminal domain

Tank truck loading station

Railway trestle bottom oil products dischage

Operationing oil terminal

Afghanistan | “Inter Asia Trade”, Hairaton, 24000 m3

  1. The foundations of the railway trestles; railway manifold.
  2. Trestle metal construction; manifold piping.
  3. Oil Tank Farm foundations.
  4. Installation of tank farm metal constructions with total tankage of 24000 m3:
    • 3 tanks 5000 m3 each
    • 1 tank 3000 m3
    • 1 tank 2000 м3
    • 4 tanks 1000 м3 each
  5. Assembly of four (4) tanks with tankage of 100 м3 for technological loss collection.
  6. Fire extinguishing water storage tanks - 2  tanks 1500 m3 each.
  7. Floating covers “KonTEK”.
  8. Tank truck loading system of 16 posts with displacement capacity of 90 m3/h each.
  9. Pump house contain five (5) pumps with capacity of 275 m3/h each, for three oil products simultaneously processing.
  10. Fuel oil manifold piping.
  11. Remote tank level monitoring system based on non-contact ultrasonic level sensors.
  12. Tank truck loading system operator building.
  13. Substation transformer, lighting and electricity.


Oil depot

Truck loading system

Top view of tanker loading area

Fuel Oil Storage

Afghanistan | “Ahmad Yar Group Ltd”, Kabul, 28000 m3

  1. Oil Tank Farm foundations.
  2. Assembly of Oil Storage Tanks:
    • 6 tanks 3000 m3
    • 2 tanks 5000 m3
  3. Assembly of four tanks 50 m3 for technologcial looses collection.
  4. Truck loading system for 16 posts with displacement capacity of 100 m3/h each.
  5. Pump house for truck load/unload operations. Contain four (4) pumps with displacement capacity of 500 m3/h each. Each pump could work separately with it's own product or simultaneously with other pumps.
  6. Fire tanks - 2  tanks 1500 m3 each.
  7. Fuel oil pipeline.
  8. Truck loading operator building. Pump control panels.
  9. Electricity and lighting.
  10. Substation transformer.


Oil Terminal

Foam Fire Fighting

Tank Truck Loading Site

Steel Vertical Tank 3000m3

 
Galati, Romania